3D print the Blue Ghost landing site on the Moon

The plain where the first fully successful commercial lander set down, on one print, from elevation data measured by lunar orbiters.

Print this place Free, in your browser. Exports a 3MF.
3D printed relief map of the Blue Ghost landing site on the Moon, a lava plain with a low volcanic rise.
Drawn in software from the tile Mini Skyline builds for this footprint. This is not an AI image.

Moon terrain: USGS Astrogeology; NASA LRO LOLA; JAXA SELENE/Kaguya. Surface imagery: LRO LROC WAC mosaic, NASA/GSFC/Arizona State University.

Where it is 18.56°N 61.81°E The Moon · near side

Landing
March 2, 2025
First
Fully successful commercial Moon landing
Operator
Firefly Aerospace, for NASA CLPS
Last contact
March 16, 2025
Blue Ghost landing site model, low angle
2.8 mm of relief

Moon terrain: USGS Astrogeology; NASA LRO LOLA; JAXA SELENE/Kaguya. Surface imagery: LRO LROC WAC mosaic, NASA/GSFC/Arizona State University.

101 by 100 km of the Moon, 160 mm across

About Blue Ghost landing site

Firefly Aerospace's Blue Ghost Mission 1 landed in Mare Crisium on March 2, 2025, near Mons Latreille, carrying NASA instruments under the Commercial Lunar Payload Services program.

It was the first fully successful commercial landing on the Moon. Its last contact was on March 16.

Sources: Firefly Aerospace: Blue Ghost Mission 1, NASA: Commercial Lunar Payload Services, Wikipedia: Blue Ghost Mission 1, USGS Astrogeology: Moon LRO LOLA - SELENE Kaguya TC DEM Merge 59m

Elsewhere on the Moon

All worlds

Moon terrain: USGS Astrogeology; NASA LRO LOLA; JAXA SELENE/Kaguya. Surface imagery: LRO LROC WAC mosaic, NASA/GSFC/Arizona State University.

Planet data: NASA, USGS Astrogeology, ESA and partners · Credits