A white 3D print of Soyu Stadium's curved main stand beside the open field, with the surrounding grounds, streets and houses.

3D print Soyu Stadium

A free, printable model of Soyu Stadium's curved main stand, with the surrounding grounds, streets and houses, generated from real map data in your browser.

Make this print Free, in your browser. Exports a slicer-ready 3MF.
  • Soyu Stadium model, North view North
  • Soyu Stadium model, East view East
  • Soyu Stadium model, South view South
  • Soyu Stadium model, West view West

The model you print

Soyu Stadium in 3D

The landmark on its own, at its size on a 160 mm print. Print friendly thickens thin parts for a 0.4 mm nozzle; Full detail keeps every part.

Drag to turn it. Scroll or pinch to zoom.

On a 160 mm print
6 mm
Scale
1:3,750

6 mm tall on a 160 mm print

Make this print opens the generator on a 600 m square around the landmark. Buildings print at close to true scale, so the landmark grows with the print size.

  1. Curved stand with thin canopy

    The model is a long, crescent-shaped stand with a shallow canopy over its middle. Print friendly keeps the thin canopy edge robust; Full detail suits a larger print, and 0.12–0.16 mm layers keep the seating rows crisp.

  2. One piece with the ground

    Soyu Stadium is joined to the ground in the exported file, and the four-side check found no floating parts, so nothing needs gluing.

  3. Pick the detail for your nozzle

    In the Buildings settings, set Landmark detail to Print friendly to adapt thin parts and small details to the print scale. Full detail keeps every modeled feature, for larger prints or a finer nozzle.

  4. Colors

    Buildings, roads, water and ground arrive as separate filament slots in the 3MF. Soyu Stadium takes the building color.

  5. File format

    You get a 3MF for Bambu Studio, OrcaSlicer or PrusaSlicer. Any of them can save it as STL if you need one.

About Soyu Stadium

Soyu Stadium is an athletics ground in Akita, Japan, formerly known as Akita Yabase Athletic Field. It lies about 3 kilometers from the city center and opened in September 1941. Akita's oldest and largest stadium, it is also the home stadium of Blaublitz Akita, a J.League team.

The stadium has been renovated several times. It was completely rebuilt in 1981, its track was repaired in 1985, and it was modified in 1995 to meet the requirements for J.League soccer. It served as the primary site of the World Games 2001 and in 1961 and 2007 it staged Japan's National Sports Festival. The Soyu name dates from April 2019, when the Soyu Corporation bought the naming rights.

About this model

Soyu Stadium is one of more than 4,900 landmark models in Mini Skyline. They are made with AI, and each one is checked from four sides in its real surroundings before release. Everything around it is built from OpenStreetMap and Overture map data. If you would rather print the shape from map data, turn off Landmark models in the Buildings settings.

Keep exploring

More landmarks to print