3D print TQL Stadium
A free, printable model of TQL Stadium and the streets and buildings around it in Cincinnati, generated from real map data in your browser.
-
North
-
East
-
South
-
West
- On a 160 mm print
- 10 mm
- Scale
- 1:3,750
10 mm tall on a 160 mm print
Make this print opens the generator on a 600 m square around the landmark. Buildings print at close to true scale, so the landmark grows with the print size.
- A ring of slanted columns
Slim slanted columns circle the outside of the bowl. Full detail keeps every column, which suits a larger print or a fine nozzle; Print friendly adapts them to the print scale.
- A broad roof over the seats
The roof covers the whole seating bowl and leaves an open rectangle above the pitch. A larger print size and layers of 0.12 to 0.16 mm keep the roof edge crisp.
- Pick the detail for your nozzle
In the Buildings settings, set Landmark detail to Print friendly to adapt thin parts and small details to the print scale. Full detail keeps every modeled feature, for larger prints or a finer nozzle.
- Colors
Buildings, roads, water and ground arrive as separate filament slots in the 3MF. TQL Stadium takes the building color.
- File format
You get a 3MF for Bambu Studio, OrcaSlicer or PrusaSlicer. Any of them can save it as STL if you need one.
About TQL Stadium
Cincinnati's TQL Stadium is built specifically for soccer, in the West End neighborhood, where Stargel Stadium once stood at Central Parkway and Wade Street. It holds about 26,000 spectators. FC Cincinnati of Major League Soccer (MLS) has played there since it opened on May 16, 2021. While under construction it was also called West End Stadium, and Total Quality Logistics, a local company, became the stadium's naming sponsor in April 2021.
It was proposed in 2016 alongside the club's bid for an MLS expansion team, to replace its temporary arrangement at Nippert Stadium. Sites in Oakley, in Newport, Kentucky, and in the West End were considered. The West End won out in early 2018, and an exchange of land with Cincinnati Public Schools approved it in April. MLS awarded Cincinnati an expansion team on May 29, 2018. Ground was broken on December 18, 2018. The stadium opened in time for the 2021 season, and the total cost was $250 million.
Preliminary designs unveiled in June 2017, by Dan Meis, showed a stadium shaped like a horseshoe, with one continuous roof and nods to Allianz Arena in Munich such as LED lighting and a translucent ETFE roof. Populous, from Kansas City, later replaced MEIS Architects as head architecture firm, and a revision announced in March 2019 extended the canopy over the whole seating area. The stadium has also staged matches between international teams, among them games of the 2023 CONCACAF Gold Cup.
About this model
TQL Stadium is one of more than 4,300 landmark models in Mini Skyline. They are made with AI, and each one is checked from four sides in its real surroundings before release. Everything around it is built from OpenStreetMap and Overture map data. If you would rather print the shape from map data, turn off Landmark models in the Buildings settings.
Keep exploring





